Showing 1-3 of 3
April 8, 2019
Alltech Completes Job for ABB at Ford Chicago Assembly Plant

Alltech Engineering Corp completed the installation of new robotic interior painting systems in two enamel paint booths at Ford Chicago Assembly Plant for ABB.  Alltech was also responsible for the design, fabrication, and installation of required structural support steel and structure for the new painting systems. Alltech received a rendering of the robots in space and was required to design a structure that not only placed the robots in the …

Read More
December 14, 2018
Big Bend Dam Intake Gate Gearbox Rehabilitation Completed

Alltech has completed the Intake Gate Gearbox Rehabilitation project at Big Bend Dam in South Dakota for the Army Corps of Engineers. The project included complete refurbishment of the 24 gearboxes that operate the power plant’s intake gate hoists. Replacement of the electrical feeders and breakers was also included.

Read More
October 5, 2018
Alltech Completed Spillway Gate Hoist Wire Ropes project at Big Bend Dam

Alltech has completed the Install Spillway Gate Hoist Wire Ropes project at Big Bend Dam in South Dakota by the Army Corps of Engineers. The project included replacement of the 80 wire ropes that raise and lower the eight spillway tainter gates. Recoating the 80 drum discs was also included in this project.

Read More