Big Bend Dam
September 27, 2017
Alltech Awarded Spillway Gate Hoist Wire Ropes Project at Big Bend Dam

Alltech has been awarded the Install Spillway Gate Hoist Wire Ropes project at Big Bend Dam in South Dakota by the Army Corps of Engineers. The project includes replacement of the 80 wire ropes that raise and lower the eight spillway tainter gates. Recoating the 80 drum discs is also included in this project.