Wisconsin Can Plant Conveyor Demolition and Installation
Alltech Engineering began this project by meeting with plant personnel and the company engineer to establish a comprehensive plan to demo existing equipment and install new equipment. Equipment installation included a new upender, uncoiler, press, mass can conveyors, and can fittings.
Alltech provided the company engineer with detailed drawings of proposed conveyor size, capacity, and locations allowing the customer to request any needed changes before conveyors and can fittings were manufactured.
Alltech worked with several other contractors to complete this project, including site contractors, electricians, pipefitters, and carpenters. The project started with the demolition of existing equipment, and the installation of new equipment was completed two weeks later.