Alltech Engineering Corp completed bridge crane installations in St. Louis, Missouri for Konecranes. ASCE Rail and conductor bar brackets were installed on three 1000 ft. long runways, along with five 5-ton top running single girder (TRSG) cranes, one 15-ton top running double girder (TRDG) crane, and two 30-ton TRDG cranes. It took two Alltech millwrights 22 days to onsite to complete the installation of eight systems.